Clothing

Outdoor Gear

Best Sellers

Average Reviews Community Rating | 2 Reviews

Kavu Long Leader Short - Men's - 2009 BCS

Available Colors / Styles

Long Leader Short - Men's
Uploaded By:
Was this helpful?
Flag This Close

Pull on the Kavu Men’s Long Leader Short before you head into the mountains or step out to your garage to tinker with your tools. The extra length protects your wheels when you have to kneel down to work on the car, while double needle-reinforced seams won’t split open when you’re trucking down the trail. Stash your keys in the security zippered pocket for safe keeping on the go, or throw a few tools in the large slash front pockets and get that lawnmower up and running.

Bottom Line: Five-o’clock shadow not included.

Talk shop with all the gear freaks out there: ask 'em questions, upload/browse photos, and give your 2¢.

Hi, throw your review on the Product Wall to show your Gear-telligence.
Hi, got a question? Ask on the Product Wall.

I have a 35 inch waist-should I buy a sz 34 or 36?

I have a 35 inch waist-should I buy a sz 34 or 36?

By:
July 6, 2009

Was this helpful? (0) (0)

Flag

A 34 will be tight, so go with a 36 and wear a belt.

By:
July 7, 2009

Was this helpful? (0) (0)

Flag

Rating for this product: 4

shallow pockets

By:
July 27, 2010

that's pretty much my only beef. the pockets are very shallow. they'll still fit my stuff and at least they have two in front AND two in the rear! other than that, i think these will be my new favorite summer all-around-do-anything-go-anywhere short. thin, light, and breezy. kinda feel naked if commando. can't wait for 'em to get out of the dryer.

Was this helpful? (0) (0)

Flag

Write your question here...What is the length of the inseam?

Write your question here...What is the length of the inseam?

By:
June 7, 2009

Was this helpful? (0) (0)

Flag

12" inseam

By: Backcountry.com Employee
June 8, 2009

Was this helpful? (0) (0)

Flag

Rating for this product: 5

Perfect Summer Shorts

By:
June 20, 2010

I've had these for about three weeks now, and so far I've worn them almost every day. So light, fast drying, and durable. I've hiked in them, been to a Dave Matthews show in them, swam in them, and ran around town in them. Awesome pair of shorts. They look great too.

Was this helpful? (0) (0)

Flag

Change me.

Out of Stock

Item: KAV0163

2009 Model No Longer Available

We have a lot more Men's Casual Shorts than that

Men's Casual Shorts

shallow pockets

4 star rating

By: montanadav1009744 July 27, 2010

that's pretty much my only beef. the pockets are very shallow. they'll still fit my stuff and at least they have two in front AND two in the rear! more...

Perfect Summer Shorts

5 star rating

By: Jordan Fox June 20, 2010

I've had these for about three weeks now, and so far I've worn them almost every day. So light, fast drying, and durable. I've hiked in them, more...

Add this to my Wish List  
This product has been added to XX List
Material:
100% Cotton 
Waist:
Belt loops 
Pockets:
2 Front, 2 back, 1 side 
Fly:
Zipper 
Recommended Use:
Hiking, camping, casual 
Manufacturer Warranty:
30 Days